    玻璃鋼防腐管道安裝要求
    時間:2022-07-05  瀏覽:5705次

      Requirements for installation of FRP pipes

      1、玻璃鋼防腐管道在安裝前應對設備管口、預埋件、預留孔洞、鋼結構等涉及管道安裝的內(nèi)容進行復核。

      1. Before installation, the pipeline shall check the contents concerning the installation of the pipeline, such as the nozzle of the equipment, the embedded parts, the reserved holes and the steel structure.

      2、管道的坡度應按圖紙的要求進行調整,調整方法可以利用支座達到坡度要求,焊縫應設置在便于檢修、觀察的地方。

      2. The gradient of the pipeline should be adjusted according to the requirements of the drawings. The adjusting method can use the support to meet the gradient requirements. The welding seam should be set in a place convenient for maintenance and observation.

      3、與傳動設備連接的管道,安裝前內(nèi)部要處理干凈,焊接固定管口一般應遠離設備,以避免焊接產(chǎn)生應力對傳動設備安裝精度的影響。

      3. The pipeline connected with the transmission equipment should be cleaned before installation, and the fixed pipe mouth should be far away from the equipment to avoid the influence of welding stress on the installation accuracy of the transmission equipment.

      4、管道與機器連接前,應防止強力相對,在自由狀態(tài)下檢查法蘭的平行度和同軸度。

      4. Before connecting the pipe with the machine, the relative strength should be prevented, and the flange's parallelism and coaxiality should be checked under the free state.

      5、安全閥應垂直安裝,在投入試運行時,要及時調校安全閥。安全閥的調校在系統(tǒng)上進行,開啟和回座壓力要符合設計文件的規(guī)定。

      5, the safety valve should be installed vertically, and the safety valve should be adjusted in time for commissioning. The final adjustment of the safety valve is carried out on the system, and the opening and returning pressure must conform to the design documents.

      6、閥門安裝前,按設計文件核對其型號,并按介質流向確定其安裝方向。當閥門與管道以法蘭或螺紋方式連接時,閥門應在關閉狀態(tài)下安裝;如以焊接方式安裝時,閥門不得關閉。

      6. Before installing the valve, check its model according to the design document and determine its installation direction according to the medium flow direction. When the valve and pipe are flanged or threaded, the valve shall be installed in a closed state; if installed in a welded way, the valve shall not be closed.

      7、儀表元件的臨時替代:所有儀表元件安裝時,均采用臨時元件替代,等試壓、沖洗、吹掃工作結束后,投料前再正式安裝。

      7. Temporary substitution of instrument components: All instrument components are installed with temporary components, and are formally installed before feeding after pressure test, flushing and purging.


    主站蜘蛛池模板: 在线视频精品一区| 00色视频在线| 欧美亚洲国产日韩一区二区三区| yy6080理论大片一级久久| 日韩一区二区三区无码免费视频| 人妻激情偷乱一区二区三区| 国产成人18黄网站在线观看| 性高湖久久久久久久久| 99精品视频在线观看婷婷| 国产在线拍揄自揄视频导航| 久久草视频在线| 亚洲成人精| 久久久久国产一级毛片高清版A| 少妇被粗大的猛烈进出动视频| 日韩毛片免费| 99九九热久久只有精品| 日韩一级片| 熟妇人妻系列av无码一区二区| 元朗区| 无码抽搐高潮喷水流白浆| 国产美女精品自产拍在线观看| 亚洲欧美日韩国产手机在线| 国产精品99精品无码视频亚瑟| 日韩精品一区二区三区免费在线观看| 国产在线视精品在一区二区| 成人无码午夜在线观看| 亚洲精品无码一二区a片| 亚洲尤物你懂的视频在线看| 国产亚洲精品成人无码精品网站 | jk白丝喷浆| 四虎永久在线精品免费AV| 国产亚洲精品美女久久久| 国产国语对白一区二区三区| 国产?熟女| 91视频导航| 性色欲情网站iwww九文堂| 久久天堂综合亚洲伊人HD| 亚洲熟妇无码av在| 婷婷伊人久久| 久久精品国产亚洲av品| 麻豆熟妇乱妇熟色A片在线看|